![719e3a44](https://img.forconstructionpros.com/files/base/acbm/fcp/image/2024/05/719e3a44.png?auto=format%2Ccompress&q=70&w=250)
Durall Industrial Floor introduces the No-Wait epoxy seal for fresh concrete.
- Special technology produces a finished covering without waiting 28 days for the concrete to fully cure
- Colored and decorative topcoats can go on without danger of lifting soon after No-Wait is applied
- No-wait is water-based, so no drying time is required between cleaning and application
Request More Information
Fill out the form below to request more information about No-Wait epoxy seal