![Sw22 5265s 22219 E Dingo R 36467 Hi Res](https://img.forconstructionpros.com/files/base/acbm/fcp/image/2024/03/sw22_5265s_22219_e_dingo_r_36467_hi_res.65fde11818c29.png?auto=format%2Ccompress&q=70&w=250)
Toro
To minimize the amount of disturbance to members and staff of a Burnsville, Minnesota church, selecting the right equipment to rise above the demolition of difficulties was essential to complete the project in a timely manner. Twin Town Demolition stepped in as contractor.
Download this case study by clicking below.